Challenge
- Live and operationally sensitive facility.
- As-built documents did not fully match field conditions.
- Strong interdependency between process, equipment and controls.

RIYADH · KAFD · WATER SYSTEMS
Within a live facility where service interruption was not acceptable, the scope covered rehabilitation of the BWRO, Kitchen RO and Grey Water systems, including mechanical components, instrumentation, panels and controls. Operational testing was then performed within clearly documented boundaries with the original building systems.